← Mathematical compendium

Published equation contexts

Tfleet=N⋅Pdevice⋅Usustained⋅AT_{\mathrm{fleet}} = N \cdot P_{\mathrm{device}} \cdot U_{\mathrm{sustained}} \cdot A

Why this formula appears here

Capacity planning built on a vendor’s peak specification, or even on a single well-tuned benchmark run, systematically overestimates what a production fleet delivers, because it leaves out two things that only show up at sustained, continuous operation: the utilization gap already discussed, and the fraction of wall-clock time the fleet is not running at all. A workable capacity model has to account for both. A simple way to state the assumption explicitly is Tfleet=N⋅Pdevice⋅Usustained⋅AT_{\mathrm{fleet}} = N \cdot P_{\mathrm{device}} \cdot U_{\mathrm{sustained}} \cdot A. where N is the device count, PdeviceP_{\mathrm{device}} is a single device’s measured (not advertised) throughput on the actual workload, UsustainedU_{\mathrm{sustained}} is the utilization fraction observed over a representative…

Read the full article-specific guide →

Read the representative guide

PdeviceP_{\mathrm{device}}

Symbol P_device

a single device’s measured (not advertised) throughput on the actual workload.

Read this term in its guide →
UsustainedU_{\mathrm{sustained}}

Symbol U_sustained

the utilization fraction observed over a representative multi-hour or multi-day window rather than a benchmark’s best run.

Read this term in its guide →
AA

Symbol A

availability — the fraction of time the fleet is actually up and assigned to the job rather than down for failure, repair, or checkpoint recovery.

Read this term in its guide →

How to interpret it

Read it with the definitions, units, and assumptions supplied by the article.

Research cited beside this formula

Published contexts (1)

A symbol can carry a different meaning in another article. Each occurrence keeps its own guide and term definitions.

Tfleet=N⋅Pdevice⋅Usustained⋅A,T_{\mathrm{fleet}} = N \cdot P_{\mathrm{device}} \cdot U_{\mathrm{sustained}} \cdot A,

Equation 1 · Semiconductors

AI Accelerator Architecture in Practice: An Advanced Technical Guide

This equation states an equality: the expressions on both sides have the same value under the article’s assumptions.

Capacity planning built on a vendor’s peak specification, or even on a single well-tuned benchmark run, systematically overestimates what a production fleet delivers, because it leaves out two things that only show up at sustained, continuous operation: the utilization gap already discussed, and the fraction of wall-clock time the fleet is not running at all. A workable capacity model has to account for both. A simple way to state the assumption explicitly is Tfleet=N⋅Pdevice⋅Usustained⋅AT_{\mathrm{fleet}} = N \cdot P_{\mathrm{device}} \cdot U_{\mathrm{sustained}} \cdot A. where N is the device count, PdeviceP_{\mathrm{device}} is a single device’s measured (not advertised) throughput on the actual workload, UsustainedU_{\mathrm{sustained}} is the utilization fraction observed over a representative…

Meanings in this article

Equation guide → · Article →