Symbol R_attainable
ttainable is the quantity selected or evaluated by the optimization written on the right.
Read this term in its guide →Published equation contexts
The general form of the argument is old and well posed. Williams, Waterman and Patterson built the roofline model on the premise that “for the recent past and foreseeable future, off-chip memory bandwidth will often be the constraining resource”, and defined operational intensity as operations per byte of DRAM traffic [ 1 ] . Their bound is one line, and it is the single most useful line in this whole subject: . with the peak arithmetic rate, B the achievable memory bandwidth and I the operational intensity of the kernel. If I is small, the second term wins and the accelerator’s headline throughput is irrelevant.
ttainable is the quantity selected or evaluated by the optimization written on the right.
Read this term in its guide →the achievable memory bandwidth and I the operational intensity of the kernel.
Read this term in its guide →Read it with the definitions, units, and assumptions supplied by the article.
A symbol can carry a different meaning in another article. Each occurrence keeps its own guide and term definitions.
Equation 1 · Small & Edge Models
This equation states an equality: the expressions on both sides have the same value under the article’s assumptions.
The general form of the argument is old and well posed. Williams, Waterman and Patterson built the roofline model on the premise that “for the recent past and foreseeable future, off-chip memory bandwidth will often be the constraining resource”, and defined operational intensity as operations per byte of DRAM traffic [ 1 ] . Their bound is one line, and it is the single most useful line in this whole subject: . with the peak arithmetic rate, B the achievable memory bandwidth and I the operational intensity of the kernel. If I is small, the second term wins and the accelerator’s headline throughput is irrelevant.