Equation 19 · Part 1 · The Physical Plant: Power, Cooling, and Networks in an AI Datacenter
Symbol T_ring
What this part means
ing is a part of this expression. Its role is fixed by the surrounding article and by the operations shown in the formula.
Its job in the formula
ing is a part of this expression. Its role is fixed by the surrounding article and by the operations shown in the formula.
Full expression→Symbol T_ring→Article meaning
The passage around this formula
The cost structure of a collective is arithmetic, not policy. For a ring AllReduce over p ranks reducing N bytes at per-link bandwidth B with per-hop latency , each rank moves . so bandwidth cost saturates near 2N/B while the latency term grows linearly in p . Two consequences follow. The slowest link sets the pace for every rank, because the operation does not complete until all ranks have contributed. And large jobs avoid large collectives: Meta reports that multi-dimensional parallelism keeps “the number of GPUs in the largest collective to hundreds of GPUs even when running a job that is tens of thousands of GPUs,” which is why their analysis focuses on…
Learn the underlying idea
A subscript is a label attached below a symbol. It often selects a time step, component, category, or member of a sequence.
Open the illustrated subscripts: which member of a family? guide →
See this notation across published equations →
Sources cited in the surrounding passage
These citations provide research context; check each source for the exact claim it supports.