← All parts of this equation

Equation 7 · Part 1 · Power Density and What It Permits

Symbol C_d

CdC_d
CdC_d

What this part means

the capacity density.

Its job in the formula

CdC_d is a part of this expression. Its role is fixed by the surrounding article and by the operations shown in the formula.

Where the article explains it

The first factor, capacity density CdC_d , is a siting and engineering question; the second is a resource and dispatch question.

The passage around this formula

The first factor, capacity density CdC_d , is a siting and engineering question; the second is a resource and dispatch question. Miller and Keith’s US measurements make the separation visible: they report 2016 mean capacity factors of 32.9 per cent for wind and 22.1 per cent for solar, with 90th-percentile values of 43 and 27.5 per…

Read this part in the article →

Learn the underlying idea

A subscript is a label attached below a symbol. It often selects a time step, component, category, or member of a sequence.

Open the illustrated subscripts: which member of a family? guide →

See this notation across published equations →

Sources cited in the surrounding passage

These citations provide research context; check each source for the exact claim it supports.