← All parts of this equation

Equation 3 · Part 1 · AI Accelerator Architecture in Practice: An Advanced Technical Guide

Symbol P_device

PdeviceP_{\mathrm{device}}
PdeviceP_{\mathrm{device}}

What this part means

a single device’s measured (not advertised) throughput on the actual workload.

Its job in the formula

PdP_device is a part of this expression. Its role is fixed by the surrounding article and by the operations shown in the formula.

Where the article explains it

where N is the device count, PdeviceP_{\mathrm{device}} is a single device’s measured (not advertised) throughput on the actual workload, UsustainedU_{\mathrm{sustained}} is the utilization fraction observed over a representative multi-hour or multi-day window rather than a benchmark’s best run, and A is availability — the fraction of time the fleet is actually up and assigned to the job rather than down for failure, repair, or checkpoint recovery.

The passage around this formula

where N is the device count, PdeviceP_{\mathrm{device}} is a single device’s measured (not advertised) throughput on the actual workload, UsustainedU_{\mathrm{sustained}} is the utilization fraction observed over a representative multi-hour or multi-day window rather than a benchmark’s best run, and A is availability — the fraction of time the fleet is actually up and assigned to the job rather than down for failure, repair, or checkpoint recovery. Treating A as 1 is the single most common capacity-planning error, and it is the one large-scale operators are most explicit about correcting for.

Read this part in the article →

Learn the underlying idea

A subscript is a label attached below a symbol. It often selects a time step, component, category, or member of a sequence.

Open the illustrated subscripts: which member of a family? guide →

See this notation across published equations →

Sources cited in the article section

These citations provide research context; check each source for the exact claim it supports.