Equation 15 · Part 5 · The Economics, Energy, and Physical Limits of Tool Protocols and the Model Context Protocol
Symbol bart_tool
What this part means
the number of tokens.
Its job in the formula
barool occurs below the fraction bar. The quantity above the bar is divided by this expression; zero is excluded as a denominator.
Full expression→Symbol bart_tool→Article meaning
Where the article explains it
If every tool schema costs on average tokens and all of them are injected in full on every turn, the maximum number of tools a deployment can nominally offer before it must start pruning or retrieving is .
The passage around this formula
…usable context window, the fixed cost of operator instructions, and a reserved allowance for the user’s message and the model’s own answer. If every tool schema costs on average tokens and all of them are injected in full on every turn, the maximum number of tools a deployment can nominally offer before it must start pruning or retrieving is . The assumption doing the work in that formula — every schema injected in full, on every…
Learn the underlying idea
A subscript is a label attached below a symbol. It often selects a time step, component, category, or member of a sequence.
Open the illustrated subscripts: which member of a family? guide →
See this notation across published equations →
Sources cited in the surrounding passage
These citations provide research context; check each source for the exact claim it supports.